ID | EN Call 136
  • Home
  • Profile
    • Organizational Structure
    • History
    • Duties & Functions
      • Kementerian ESDM
      • Secretariat General
      • Inspectorate General
      • Directorate General of Oil and Gas
      • Directorate General of Electricity
      • Directorate General of Mineral and Coal
      • Direktorat Jenderal Penegakan Hukum
      • Directorate General of New Renewable Energy and Energy Conservation
      • Geological Agency
      • Human Resources Development Agency of Energy and Mineral Resources
    • Location & Contact
    • List of Ministers
    • Logo Meaning
    • Profile Pimpinan Kementerian ESDM
  • Echelon I
    • Secretariat General
    • DG NREEC
    • DG Electricity
    • DG Oil and Gas
    • DG Mineral and Coal
    • Inspectorate General
    • Geological Agency
    • HR Agency
  • Bureaucratic Reforms
    • Public Service Innovation
      • Service Improvement
      • Policy Making Participation
      • Colaborative Support
    • Inspiring Story Changes
      • PNBP Dashboard
      • Lecturer
    • BR News Rubric
      • BR News
    • BR Photos
      • Kementerian ESDM Masuk Nominasi 8 Besar Percepatan Pelaksanaan Berusaha BKPM
      • Penguatan Tata Kelola Kelembagaan Kementerian ESDM
      • Penguatan Tata Kelola Kelembagaan untuk Pengembangan SDM ESDM yang Berdampak
      • Arahan Sekjen pada Pembekalan Agen Perubahan KESDM
      • Reformasi Birokrasi unit kerja eselon I
      • Kementerian ESDM Butuh Role Model Perubahan
      • Proses Verifikasi Lapangan dan Eveluasi Pelaksanaan Reformasi Birokrasi KESDM
      • Kunjungan Kerja Transformasi Organisasi
      • Implementasi RB Balitbang
      • 4 Unit Kerja Kementerian ESDM Raih Penghargaan Wilayah Bebas Korupsi
      • Submit PMPRB ke KemenPANRB
      • Submit Mandiri Pelaksanaan Reformasi Birokrasi (PMPRB) Sekretariat Jenderal KESDM
      • Arahan Sekjen KESDM Terkait Penilaian Mandiri Pelaksanaan Zona Integrasi (PMPZI)
    • Capaian Reformasi Birokrasi
    • Road Map RB
      • Road Map RB KESDM 2020-2024
  • Publication
    • Kegiatan DWP Persatuan Kementerian ESDM
      • Berita
      • Berita Photo
    • The strategic plan
    • Rencana Kerja dan Anggaran
    • Key Performance Report (LAKIP)
    • Key Performance Indicator (KPI)
    • Laporan Keuangan
    • Indonesia Energy Outlook
    • Handbook Of Energy & Economic Statistics Of Indonesia (HEESI)
    • Infographics
    • Publication of Study Results
    • Others
    • Indeks Kepuasan Masyarakat
      • SKM Kementerian ESDM
      • IKM Sekretariat Jenderal
      • IKM Inspektorat Jenderal
      • IKM Ditjen Migas
      • IKM Ditjen Ketenagalistrikan
      • IKM Ditjen Minerba
      • IKM Ditjen EBTKE
      • IKM Badan Geologi
      • IKM BPSDM
      • SKM BPH Migas
      • SKM DEN
  • Inline
  • 136 INFO

RECENT

  • The Official Online Communication Channel of The Ministry is through *...
  • Menteri ESDM Dijadwalkan Meresmikan Kantor Sekretariat Just Energy Tra...
  • Kembangkan Infrastruktur Energi, Pemerintah Dorong Pembangunan Energi ...
  • Layanan Permohonan dan Pengaduan Informasi Kementerian ESDM Silakan Ko...
  1. Home
  2. Media Center
  3. News Archives

News Archives

Eksploitasi Sumur Panas Bumi Rantau Dedap Dimulai, Akan Hasilkan Listrik 220 MW

Sunday, 5 August 2018 Eksploitasi Sumur Panas Bumi Rantau Dedap Dimulai, Akan Hasilkan Listrik 220 MW

ICP Juli Naik ke Angka USD 70,68 per Barel, Permintaan Minyak Mentah Dunia Jadi Faktor Utama

Sunday, 5 August 2018 ICP Juli Naik ke Angka USD 70,68 per Barel, Permintaan Minyak Mentah Dunia Jadi Faktor Utama

Jonan Minta Pejabat Kerjakan yang Bermanfaat bagi Bangsa

Sunday, 5 August 2018 Jonan Minta Pejabat Kerjakan yang Bermanfaat bagi Bangsa

Arcandra: Panas Bumi Salah Satu Energi Paling Hijau

Saturday, 4 August 2018 Arcandra: Panas Bumi Salah Satu Energi Paling Hijau

Ini Pesan Arcandra kepada Mahasiswa Baru Universitas Negeri Padang

Friday, 3 August 2018 Ini Pesan Arcandra kepada Mahasiswa Baru Universitas Negeri Padang

Perpanjangan Kontrak WK Brantas, Bentuk Kepastian Investasi Pemerintah

Friday, 3 August 2018 Perpanjangan Kontrak WK Brantas, Bentuk Kepastian Investasi Pemerintah

Pesan Arcandra ke Generasi Muda: Buat Inovasi Yang Bermanfaat Untuk Orang Banyak

Friday, 3 August 2018 Pesan Arcandra ke Generasi Muda: Buat Inovasi Yang Bermanfaat Untuk Orang Banyak

Agustus 2018, Harga Batubara Acuan USD 107,83 per Ton, Harga Mineral Acuan Cenderung Turun

Friday, 3 August 2018 Agustus 2018, Harga Batubara Acuan USD 107,83 per Ton, Harga Mineral Acuan Cenderung Turun

Kontrak Bagi Hasil Gross Split Wilayah Kerja Brantas Ditandatangani, Pemerintah Terima Bonus Tanda Tangan USD 1 Juta

Friday, 3 August 2018 Kontrak Bagi Hasil Gross Split Wilayah Kerja Brantas Ditandatangani, Pemerintah Terima Bonus Tanda Tangan USD 1 Juta

Tingkatkan Efisiensi, Peluang Bisnis Hulu Sampai Hilir Gas Terbuka Lebar

Friday, 3 August 2018 Tingkatkan Efisiensi, Peluang Bisnis Hulu Sampai Hilir Gas Terbuka Lebar

Ini Langkah Pemerintah untuk Pastikan Harga Gas Semakin Terjangkau Kompetitif

Friday, 3 August 2018 Ini Langkah Pemerintah untuk Pastikan Harga Gas Semakin Terjangkau Kompetitif

Perjuangan Dibalik Penyaluran BBM Satu Harga

Thursday, 2 August 2018 Perjuangan Dibalik Penyaluran BBM Satu Harga

Sasar 3 Wilayah Pedalaman, BBM Satu Harga Kini Jangkau 68 Titik

Thursday, 2 August 2018 Sasar 3 Wilayah Pedalaman, BBM Satu Harga Kini Jangkau 68 Titik

Ini Target Jonan Usulkan Subsidi Sambung Listrik untuk Masyarakat Tidak Mampu

Thursday, 2 August 2018 Ini Target Jonan Usulkan Subsidi Sambung Listrik untuk Masyarakat Tidak Mampu

Mobil Listrik Tingkatkan Ketahanan Energi Nasional

Thursday, 2 August 2018 Mobil Listrik Tingkatkan Ketahanan Energi Nasional

  • 325
  • 326
  • 327
  • 328
  • 329
Copy Right © 2026 The Ministry of Energy and Mineral Resources
Jl. Medan Merdeka Selatan No. 18 Jakarta Pusat 10110
Phone. 021 3804242 Fax. 021 3507210
Contact Us
contactcenter136@esdm.go.id
Call Center:
136
v2.11.0